Work Permit Module

Posted on:

• Hazard Analysis – Includes Hazards, Safety Precautions, Special Permits and Additional Safety Categories
• Infinite number of user defined categories that incorporate a facilities entire Safety Permit.

Request Isolation Permit Module

Posted on:

• Customizable Questions
• Reference Drawings – List any drawings that are associated with the Asset for this Request Isolation Permit
• Hazard Analysis – includes Safety Equipment and an infinite number of user driven categories and their respective items.

Printer Module

Posted on:

• Permit printing is universal across all permit types.
• Multiple printers can be set up inside TK Pro® & Custom Reports Lists can be setup in the printer settings to print multiple reports in one click

Permanent Tag Permit Module

Posted on:

• Permanent Tag; i.e. Caution, Retired Tag tracking and visibility
• Auditing capability of “permanent” tags that remain for long periods of time

Lockout Tagout Permit Module

Posted on:

TK Pro® uses STANDARDS [TEMPLATES] to help standardize the lockout-tagout (LOTO) process, improve accuracy, improve safety and reduces the labor associated with each LOTO event. STANDARDS allow TK Pro to generate all of the required safety paperwork and tags in as little as 3 mouse clicks. Key LOTO functionality in TK Pro® is:  

• Common Tag – With this option enabled, you will receive a notification when an action is attempted on an Isolation Point that is common with another active Permit
• Lock Boxes / Locks
• Unique Lock Boxes – With this option enabled, when a lock box number is selected it is taken out of rotation so it cannot be used on another Permit until the Permit using the lock-box is complete
• Verification Requirements
• Procedure Tab – Insert Links to files, also insert Pictures
• Testing – Ability to shift a specific isolation point in test mode
• Import Tags – Ability to search entire the entire database of approved Isolation Points for importing
• Lost Key – Used to report a lost lock key and reason

Line Break Permit Module

Posted on:

• Materials required
• Personal Protective Equipment required

Hot Work Permit Module

Posted on:

• Hazard Analysis – includes Safety Equipment and an infinite number of user driven categories and their respective items.
• Contractor / Fire Watch Identification
• Continuation – Ability to extend the permit for set duration of days/hours. This gives you the ability to keep the Permit # the same but simply “Continue/Extend” the existing permit.

Fire Protection Permit Module

Posted on:

• Location impacted by permit
• Operational Impact – Ability to identify all company operations that will be impacted by this work.

Equipment Loan Permit Module

Posted on:

• Company Identification – Who is using equipment
• Contact Person – from company above
• User Assigned – Employee issuing permit

Energized Electrical Work Permit Module

Posted on:

• Special Instructions – Enter any special instructions required for this Energized Electrical Work Permit
• Hazard Analysis – includes Personal Protective Equipment, Hazards, Atmospheric Hazards, Safety Precautions, Means of Access, Pre- Entry Actions, Rescue Protocol an infinite number of user driven categories and their respective items.